Building automation under the EPBD: who needs it, and by when

Office towers seen from below with wireless signal rings

The recast Energy Performance of Buildings Directive, Directive (EU) 2024/1275, keeps and widens the requirement for building automation and control systems (BACS) in non-residential buildings, which includes hotels, offices, retail and public buildings.

The two thresholds

Article 13(9) requires Member States to make non-residential buildings, where technically and economically feasible, fit building automation and control systems:

  • by 31 December 2024, where the effective rated output of the heating, air-conditioning, combined heating and ventilation, or combined air-conditioning and ventilation systems is over 290 kW;
  • by 31 December 2029, where that output is over 70 kW.

The figure is the rated output of the systems, not the floor area. Many mid-size hotels and office buildings pass 70 kW once heating and cooling plant are added together.

What the system has to do

A tick-box controller is not enough. The directive expects the system to monitor, log and analyse energy use continuously, compare it with benchmarks, detect efficiency losses, and talk to the other technical systems in the building. The recast adds that by 29 May 2026 these systems must also be able to monitor indoor environmental quality.

Where Greece stands

Member States had to transpose the recast directive by 29 May 2026. A March 2026 review by BPIE described Greece’s transposition as still pending, so the detailed national rules may still change. The thresholds and dates above come from the directive itself.

What to check now

  • Add up the rated output of your heating, cooling and ventilation plant.
  • List which systems are already controlled centrally, and which run on local timers or thermostats.
  • Check whether your current BMS logs energy data and can share it with other systems.
  • Plan sensors for temperature, humidity and CO₂ where people spend time.

Rething installs automation on top of the systems you already own, so meeting the requirement rarely means replacing a working BMS.

Sources